ALTUS ADVISORY
نبذة عنادراسات الحالةالتحقق من شهادة
دراسات حالة توضيحية
دراسة حالة توضيحية
التعافي والريادة المستدامة لمنتجع رئيسي
Turnaround · Egypt
- ملف العميل
- A 300+ key branded beachfront resort in a fiercely competitive leisure market.
- التحدي
- Stagnant RevPAR, slipping guest-satisfaction scores, and margin erosion.
- المنهجية
- Commercial re-engineering: pricing architecture, channel mix, service-culture programme, Six Sigma-led guest-journey redesign.
- النتائج
- No. 1 in its competitive set for six consecutive years, with structural GOP margin expansion.
+25% RevPAR +30% guest satisfaction #1 comp set, 6 years $340K annual savings, one DMAIC project
دراسة حالة توضيحية
تفويض التميز التشغيلي على مستوى المحفظة
Operational excellence · Egypt
- ملف العميل
- A global operator's country portfolio of 19 hotels and 3,000+ rooms.
- التحدي
- Inconsistent service delivery, fragmented F&B performance, uneven brand-standard compliance.
- المنهجية
- Standards harmonisation, property diagnostics, GM and HOD coaching, monthly performance instrumentation.
- النتائج
- Portfolio-wide uplift in guest satisfaction and F&B revenue within 18 months.
19 hotels 3,000+ rooms +10% guest satisfaction +8% F&B revenue in 18 months
دراسة حالة توضيحية
افتتاح فندقين في وقت واحد
Pre-opening · KSA
- ملف العميل
- A regional hospitality group commissioning two new-build properties with a single opening season.
- التحدي
- Parallel critical paths across licensing, recruitment, OS&E, systems and brand standards.
- المنهجية
- Integrated pre-opening command structure, staged recruitment and training waves, procurement governance.
- النتائج
- Both opened on schedule and reached market-leading profitability in the region.
2 hotels opened simultaneously 90–95% operational readiness T-0 on-time opening
دراسة حالة توضيحية
ممثل المالك لمحفظة فنادق في الرياض
Owner representation · Riyadh
- ملف العميل
- An institutional owner developing four internationally branded hotels.
- التحدي
- Safeguarding owner interests across HMA governance, technical services, procurement and handover.
- المنهجية
- Owner-representation office: HMA compliance, design and procurement challenge, milestone-based contractor management.
- النتائج
- Budgets defended, claims mitigated, handovers executed to operator acceptance.
4 branded assets Full HMA governance 100% handovers accepted
مشاريع مركّبة، مجهولة الهوية ومصنّفة بوضوح على أنها توضيحية.